{"id":5296,"date":"2020-07-30T00:00:00","date_gmt":"2020-07-29T22:00:00","guid":{"rendered":"https:\/\/ltou.lt\/mitnija-will-build-a-new-passenger-departures-terminal-at-vilnius-airport\/"},"modified":"2020-07-30T00:00:00","modified_gmt":"2020-07-29T22:00:00","slug":"mitnija-will-build-a-new-passenger-departures-terminal-at-vilnius-airport","status":"publish","type":"post","link":"https:\/\/ltou.lt\/en\/mitnija-will-build-a-new-passenger-departures-terminal-at-vilnius-airport\/","title":{"rendered":"Mitnija will build a new passenger departures terminal at Vilnius Airport"},"content":{"rendered":"<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">Mitnija, one of the largest construction companies in Lithuania, has won an almost EUR 25 million public tender to build a new 14,400 sq. m passenger terminal at Vilnius International Airport. The contract also includes transformation of another 34,000 sq. m of access areas. The project was commissioned by Lithuanian Airports, a state-owned enterprise. After completion of equipment installation and other technical work, the terminal will welcome passengers at the end of 2022.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">The new A++ energy efficiency passenger terminal will be built in the northern area of the airport, between the old terminal and the recently built VIP terminal with a conference center. It will increase the total area of Vilnius airport terminals by one third, and passenger capacity will more than double from the current 900 to 2,400 passengers per hour.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">The new terminal will have two stories. The first story will house passenger check-in and public spaces, as well as cafes, airline company offices and other commercial premises. On the second story, there will be a security check area and departure gates for Schengen passengers.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">The building will also have the necessary technical areas \u2013 baggage screening and sorting, engineering systems. The new terminal will be connected to the existing one by a spacious gallery which will ensure easy movement between the two terminals.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">\u201cWe are launching one of the most important stages of this four-year project. Detailed planning of works and needs has taken several years. The project is necessary for increasing the capacity of Vilnius Airport and becomes even more relevant in an attempt to adapt to the new challenges posed by the pandemic. It will allow for even more efficient distancing. Its successful implementation calls not only for a modern, large area but also for technological solutions inside of it. The new terminal will therefore have a much more modern infrastructure designed for passenger convenience, more automated solutions and self-service,\u201d said Dainius \u010ciuplys, Head of Vilnius Airport.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">According to Mr \u010ciuplys, investments in the new terminal are planned to pay off in 10 to 15 years. Actual works and the preparation of the site for the new building should begin shortly. During all scheduled work, the airport will operate as usual.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">Julius Gendvilis, CEO of Mitnija, said that the successful tender to construct the new terminal at the Vilnius airport is an acknowledgement of the company\u2019s experience in building complex public infrastructure projects.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">\u201cWe built the Kaunas Clinics at the Lithuanian University of Health Sciences and the National Center for Physical and Technological Sciences, took part in implementing the Rail Baltica project, built the athletic training center in Druskininkai and renovated and upgraded Lithuanian and Latvian air force base infrastructure for NATO and the U.S. Air Force, among other projects. I am absolutely certain that we will also complete the new terminal at Vilnius International Airport on time and within the agreed budget\u201d.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">Andrius Drizga, Mitnija\u2019s Project Manager, said that, along with the construction of the new terminal, the company will also transform the terminal\u2019s access areas.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">\u201cThis work will pose the greatest challenge to our team. In only three months we will have to upgrade 34,000 sq. m of access areas \u2013 reconfigure the engineering networks, parking lot and transport system, as well as construct roof covers. This will create a new transport system with a much better throughput. We already know that this work is likely to proceed 24\/7.\u201d<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">Mitnija will ensure that the construction of the new terminal at the Vilnius airport does not affect the airport\u2019s operations and will guarantee the safety and comfort of its passengers and staff. Special attention will also be paid to energy efficiency, sustainability and environmental requirements. The new terminal building will meet A++ energy efficiency requirements, and Mitnija will carry out the construction in accordance with the BREEAM standard, aiming for a \u201cGood\u201d evaluation.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">Seven construction companies participated in the public construction tender to build a new passenger departure terminal at Vilnius International Airport.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><b><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">About Lithuanian Airports<\/span><\/span><\/span><\/span><\/b><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\"><span style=\"color:black\">The Lithuanian Airports network includes three airports in Vilnius, Kaunas and Palanga. In 2019, they serviced 6.5 million passengers and 62,000 flights.<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\">\u00a0<\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><b><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\">About Mitnija<\/span><\/span><\/span><\/b><\/span><\/span><\/span><\/p>\n<p style=\"margin: 0cm 7.1pt 0.0001pt 0cm; text-align: justify;\"><span style=\"font-size:11pt\"><span style=\"line-height:115%\"><span style=\"font-family:Arial,sans-serif\"><span lang=\"EN-US\" style=\"font-size:12.0pt\"><span style=\"line-height:115%\"><span style=\"font-family:&quot;Open Sans&quot;,sans-serif\">Mitnija is one of the largest construction companies in Lithuania. In 2019 the company earned EUR 109 million in revenue. It has over 330 employees. Mitnija builds commercial, industrial, infrastructural and residential projects. Mitnija\u2019s key market is in Lithuania. In 2016, the company also began operating in the United Kingdom and Latvia; it plans to continue to expand into stable European markets in the future. Mitnija operates under international standards for quality (ISO 9001) and environmental management (ISO 14001).<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mitnija, one of the largest construction companies in Lithuania, has won an almost EUR 25 million public tender to build a new 14,400 sq. m passenger terminal at Vilnius International Airport. The contract also includes transformation of another 34,000 sq. m of access areas. The project was commissioned by Lithuanian Airports, a state-owned enterprise. After &hellip; <a href=\"https:\/\/ltou.lt\/en\/mitnija-will-build-a-new-passenger-departures-terminal-at-vilnius-airport\/\">Continued<\/a><\/p>\n","protected":false},"author":22,"featured_media":7445,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ep_exclude_from_search":false,"footnotes":"","_wp_rev_ctl_limit":""},"categories":[1],"tags":[],"class_list":["post-5296","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-07-20 04:23:14","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/posts\/5296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/comments?post=5296"}],"version-history":[{"count":0,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/posts\/5296\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/media\/7445"}],"wp:attachment":[{"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/media?parent=5296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/categories?post=5296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ltou.lt\/en\/wp-json\/wp\/v2\/tags?post=5296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}