Allow

[[#ex]]

Modernization of Vilnius Airport Noise Monitoring System

State enterprise Lithuanian Airports is implementing project No. 06.1.1-TID-V-506-01-0002 “Modernization of Vilnius Airport Noise Monitoring System“

The aim of the project is to modernize the noise monitoring, evaluation and management system in Vilnius Airport, which will reduce the noise level and facilitate the process of planning, implementation and efficiency monitoring of noise mitigation measures.

Results achieved by the project:

  • The physical hardware of the 4 stationary noise monitoring stations will be completely upgraded and two new mobile noise monitoring stations will be acquired;
  • Noise monitoring system software and its components will be upgraded, also their functionality, security and availability will be improved.


The project is funded by the European Cohesion Fund.


Runway reconstruction

Project executor: State Enterprise Lithuanian Airports  
Project number: 06.1.1-TID-V-506-01-0001  
Project title: RECONSTRUCTION OF VILNIUS AIRPORT AIRCRAFT RUNWAY AND SIGNAL LIGHT SYSTEM, THUS IMPROVING FLIGHT SAFETY CONDITIONS
Project work:  
1.1.1 Reconstruction of the commutation part and primary circuits of the runway lights control system
1.1.2 Reconstruction of runway and signal lights system
Project implementation period: 2017-2018
Action programme: 06.1.1-TID-V-506 Improving environmental and flight safety at international airports

Description of the project. The project will be implemented at Vilnius Airport (managed by SE Lithuanian Airports). The aircraft runway was built in 1958 (RWY) and was last reconstructed more than 20 years ago. The runway is paved with asphalt, the asphalt paving is physically worn, there are fractures and transverse cracks. The runway has reached its limit of use, requiring immediate reconstruction of the runway and signal lights system.

The aim of the project is to improve flight safety at Vilnius Airport.

As part of the project, the runway surface and infrastructure of the signal lights system will be upgraded.

Project work

Work type

Responsible body

1.1.1. Contract work (Reconstruction of the commutation part and primary circuits of the runway lights control system)

Designing

UAB “Pastatų konstrukcijos”, UAB “Eltida”

Project expertise

UAB “Klaipėdos ekspertizė”

Contract work

UAB “Elektros darbai”, UAB “Fegda”

Maintenance services

UAB Statybos inžinierinės paslaugos

FIDIC engineer services

UAB Statybos inžinierinės paslaugos

1.1.2 Contract work (Reconstruction of runway and signal lights system)

Designing

UAB “Vilniaus hidroprojektas”

Project expertise

UAB “Ekspertika”

Contract work

AB “A.C.B.”, UAB “Autokausta”

Maintenance services

UAB Statybos inžinierių konsultantų biuras, AB Problematika

FIDIC engineer services

UAB Statybos inžinierių konsultantų biuras, AB Problematika

Labaratory tests

AB “Problematika”, VŠĮ Vilniaus Gedimino technikos universitetas

Project supervision

UAB “Vilniaus hidroprojektas”

The value of the project (in euros):

Reconstruction of Vilnius Airport aircraft runway and signal light system, thus improving flight safety conditions

Eligible costs:

21,198,273,72

- ES F funds

10,493,144,00

- State budget funds

0

- Funds of the project executor

10,705,129,72

Costs not included in project finance and administration contract

256,210,80

Total excluding VAT

21,454,484,52

VAT:

4,505,441,75

Total:

25,959,926,27

 

The project is co-financed by the Cohesion Funds.


Reconstruction of apron pavement

Project contractor: State Enterprise Vilnius International Airport 
Project No.: VP2-5.3-SM-01-V-01-015 
Project title: Reconstruction of Vilnius International Airport Apron Pavement 
Project activities: 
1.1.1 Contract work 
1.1.2 Project implementation supervision 
The term of project implementation: Year 2011 
Operational programme: VP2 Operational Programme for Economic Growth 
Priority: VP2-5 Development of Trans-European Transport Networks 
Task: VP2-5.3 Development of International Airport Infrastructure Capacity 
Implementation: VP2-5.3-SM-01-V Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures

Project contractors:

Project activities Work Contractor
1.1.1. Contract work Design UAB „Kelprojektas"
Project expertise UAB „Darbasta"
Contract work UAB „Fegda“
Technical supervision service AB „Problematika“
FIDIC engineer service UAB „Darbasta“
Laboratory research VGTU
Project implementation supervision UAB „Kelprojektas"

 

Project value (LTL):

Apron Eligible expenditure: 26 336 308,10
- EU funds 19 027 982,60
- State budget funds 3 357 879,28
- Project contractor funds 3 950 446,22
Expenditure exclusive of financing and administration contract 452 734,85
Total VAT exclusive: 26 789 042,95
VAT: 5 625 699,02
TOTAL: 32 414 741,97

Reconstruction of taxiways D and F

Project contractor: State Enterprise Vilnius International Airport 
Project No.: VP2-5.3-SM-01-V-01-014 
Project title: Reconstruction of Vilnius International Airport Taxiways D and F 
Project activities: 
1.1.1 Contract work 
1.1.2 Project implementation supervision 
The term of project implementation: Year 2011 
Operational programme: VP2 Operational Programme for Economic Growth 
Priority: VP2-5 Development of Trans-European Transport Networks 
Task: VP2-5.3 Development of International Airport Infrastructure Capacity 
Implementation: VP2-5.3-SM-01-V Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures

Project contractors:

Project activities Work Contractor
1.1.1. Contract work Design UAB „Kelprojektas"
Project expertise UAB „Darbasta"
Contract work UAB „Lemminkainen Lietuva“
Technical supervision service AB „Problematika“
FIDIC engineer service UAB „Darbasta“
Laboratory research VGTU
Project implementation supervision UAB „Kelprojektas"

 

Project value (LTL):

D and F

Eligible expenditure:

4 552 869,03

- EU funds

2 418 502,58

- State budget funds

426 794,57

- Project contractor funds

1 707 571,88

Expenditure exclusive of financing and administration contract

452 734,85

Non-eligible expenditure

405.800,19

Total VAT exclusive:

4 969 523,96

VAT:

1 043 600,03

TOTAL:

6 013 123,99


Project Construction of Vilnius International Airport Taxiway 9.4 (E)

The project has been approved by the Order No. 3-383 of 13 October 2008 of the Minister of Transport and Communications of the Republic of Lithuania regarding the approval of the national project list for VP2-5.3-SM-01-V measure Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures under Priority 5 Development of Trans-European Transport Networks of the Operational Programme for Economic Growth of the European Union Structural Support Absorption Strategy for Lithuania for 2007-2013.

As part of the implementation of the project, funds have been allocated by the European Union and the Government of the Republic of Lithuania for the joint financing of the project as stipulated by the Order No. 3-147 of 21 April 2009 of the Minister of Transport and Communications of the Republic of Lithuania regarding funding of the Projects Submitted under VP2-5.3-SM-01-V measure Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures under Priority 5 Development of Trans-European Transport Networks.

Please be informed that with regard to the project Construction of the Vilnius International Airport Taxiway 9.4 (E) No. VP2-5.3-SM-01-V-01-007, financed from the European Union Cohesion Fund for 2007-2013, a tripartite financing and administration agreement was signed 30 June 2009 between the Ministry of Transport and Communications of the Republic of Lithuania, the Transport Investment Directorate, and the state enterprise Vilnius International Airport. Project funds: EU funds account for LTL 2,835,693.03, state budget funds - LTL 500,416.42, Vilnius International Airport shall be liable for the allocation of no less than LTL 332,767.10.

Essence of the project. 
The objective of the project is to improve and increase the capacity of the International Vilnius Airport (TVOU), which is in line with the provisions in the clause 64.1. (creation of a good-quality, integrated and transit-adjusted air transport system) and clause 67.3 (modernisation of the airport infrastructure) of the Long-term (until year 2025) Lithuanian transport system development strategy. In order to satisfy the growing demand for air passenger and cargo transportation capacity, more flights are required, thus a new aircraft taxiway 9.4 (E) was built. It connects the runway and the aircraft taxiway, increases runway permeability, allows more aircrafts to be served simultaneously, saves aviation fuel and flight time, reduces pollution, allows decreasing aircraft noise in the southern part of the TVOU. Implementation of the project will increase air safety, contribute to the attractiveness of the airport, ensure its uninterrupted activity, offer a better environment for tourism and business trips as well as for the formation of the capital city´s airport image. The new connecting taxiway will reduce the time it takes for aircrafts to reach the starting or apron parking area, decrease engine operation during manoeuvre and at the same time, reduce air pollution and noise in the territory of the TVOU. Upon its completion, the project shall offer the airport the possibility to ensure better service provision, reduce the losses and risk incurred by the airlines. The TVOU, in turn, shall create new jobs in the airport, airlines, customs and companies in the tourism industry that is developing on the outskirts of the airport, thus encouraging investment and new jobs, which directly and indirectly shall contribute to the regional and national social development.

Project continuity. 
The organisational structure of the TVOU ensures efficient management and use of the taxiway 9.4 (E). Implementation of the project will lead to the expansion of the scale and increased quality of the services provided by the TVOU. Renovation and maintenance of the newly-built taxiway will be financed by the TVOU. Implementation of the project will allow reducing aircraft taxi distance, increasing the permeability of runways, and decreasing the cost of aviation fuel and flight duration. No less than five years after the completion of the project, the assets which received financing shall not be transferred, mortgaged or become otherwise subject to restricted rights of use.

The total value of the project VAT excluded is LTL 3.668.876,55.

Title of the source of financing Amount, LTL
Financing from EU structural funds 2.835.693,03
State budget funds 500.416,42
Own funds 332.767,10
Other sources of financing 0,00
Total 3.668.876,55

Project Construction of the New Vilnius International Airport Passenger Terminal for non-Schengen Passengers

The project has been approved by the Order No. 3-383 of 13 October 2008 of the Minister of Transport and Communications of the Republic of Lithuania regarding the approval of the national project list for VP2-5.3-SM-01-V measure Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures under Priority 5 Development of Trans-European Transport Networks of the Operational Programme for Economic Growth of the European Union Structural Support Absorption Strategy for Lithuania for 2007–2013. As part of the implementation of the project, funds have been allocated by the European Union and the Government of the Republic of Lithuania for the joint financing of the project as stipulated by the Order No. 3-147 of 21 April 2009 of the Minister of Transport and Communications of the Republic of Lithuania regarding funding of the Projects Submitted under VP2-5.3-SM-01-V measure Expansion of International Airport Passenger Terminals, Introduction of Air Safety and Aviation Security Measures under Priority 5 Development of Trans-European Transport Networks.

Please be informed that with regard to the project Construction of the New Vilnius International Airport Passenger Terminal for non-Schengen Passengers No. VP2-5.3-SM-01-V-01-006, financed from the European Union Cohesion Fund for 2007–2013, a tripartite financing and administration agreement was signed 28 May 2009 between the Ministry of Transport and Communications of the Republic of Lithuania, the Transport Investment Directorate, and the state enterprise Vilnius International Airport. Project funds: EU funds account for LTL 14.429.000, jointly contributed funds amount to LTL 2.547.000, Vilnius International Airport shall be liable for the allocation of no less than LTL 58.599.708,30

Essence of the project. 
As part of the implementation of the project, the passenger terminal shall be adjusted to comply with the requirements of the Schengen Acquis through the construction of a new passenger terminal prior to the accession to the Schengen Acquis so as to ensure that from January 2008 the TVOU has the possibility of serving non-Schengen flights and passengers by separating extra- and intra-Schengen passenger flows in the new airport terminal. The key requirement raised for the TVOU passenger terminal constitutes the free movement of Schengen citizens inside the respective area without the provision of passports. The new building provides for the official premises designated for the State Border Guard Service (VSAT) and customs, passenger lounge areas, 12 passenger registration desks, 6 passenger inspection cabins with two workplaces each, 9 aviation security inspection points, baggage department, other relevant premises that ensure the operation of the terminal.

The goal of the passenger terminal is to separate extra- and intra-Schengen passenger flows and increase airport capacity with the view of increasing passenger flows as well as provide high-quality service.

Project implementation will also contribute to the resolution of the following issues at the TVOU: Vilnius Airport serves the largest number of international flights and is the biggest in Lithuania in terms of passenger transportation but compared to regional Western European airports it is classified as a mid-size airport; the TVOU infrastructure requires adjustment to meet the requirements of increased passenger flows; as part of TVOU infrastructural expansion and modernisation, special attention must be paid to the implementation of additional aviation security measures; the capacity of the Vilnius Airport is not used completely as the flight schedule offers room for more flights; the TVOU passenger terminal falls behind the Schengen Acquis and other EU requirements.

Project continuity. 
Responsibility for the maintenance of the newly-built passenger terminal and proper use of the respective infrastructure shall be assumed by the TVOU. No less than five years after the completion of the project, the new terminal shall not be transferred, mortgaged or become otherwise subject to restricted rights of use. Implementation of the project will lead to the expansion of the scope and increased quality of the services provided by the TVOU and will contribute to the competitiveness and attractiveness of the TVOU. With the construction of the new terminal, the TVOU anticipates further development of the infrastructure: increasing passenger and baggage registration as well as boarding convenience through the introduction of automatic registration points, automatic boarding control systems that would speed up the service of incoming passengers.

The total value of the project VAT excluded is LTL - 104.604.770,15.

Title of the source of financing Amount, LTL
Financing from EU structural funds 14.429.000,00
State budget funds 2.547.000,00
Own funds 58.599.708,30
Other sources of financing 0,00
Total 75.575.708,30